Mond Second Bridge, Province of Booshehr, Iran
Seven Spans of Reinforced Concrete with the Length of 20.7m Each
Total Length of the Bridge 144.9m with the Width of 11.80m
Client
Ministry of Roads and Transportation
Date of Completion
Services Delivered
Preliminary and Detailed Design of the Alignment and the Bridge/ Supervision of Construction