Ghadir Bridges, Province of Isfahan, Iran

- Spans of the Main Bridge: 44.63+70+44.63 of In-Situ Balanced Cantilever Pre-Stressed Concrete Twin Single Cell with Total Length of 159.26m

Total Width of 22.5m

- Spans of Access Bridges: 17x21.5m and 11x21.5m of Side by Side Precast Concrete Beams

Two Ramp Bridges of Reinforced Concrete Voided Slab

Total Length of the Bridges: 761m

Client
Isfahan Municipality

Date of Completion
1999

Services Delivered
Preliminary and Detailed Design of the Alignment and the Bridge/ Supervision of the Construction

Awards

Iranian Concrete Institute Award (2004)