Khordad the Third (Darkhovin Oil Field) Bridge over the Karoon Perennial River, Province of Khoozestan, Iran

Spans: 60+120+60+30+30 of In-situ Balanced Cantilever Pre-stressed Concrete Single Cell Box Girder

Total Length of the Bridge 300m

Client
Ministry of Road and Urban Development

Date of Completion
2005

Services Delivered
Preliminary and Detailed Design of the Alignment and the Bridge/ Supervision of the Construction (EPC Mode)

Awards

(Iranian Concrete Institute Award (2006