Ahvaz Eighth Bridge over the Karoon Perennial River, Province of Khoozestan, Iran 
Spans: 10×25+78+212+78+9×25 of Cable-Stayed Bridge Consisting of Pile Foundation and Composite Steel Box Girder

Total Length of the Bridge 843 m

Client
Municipality of Ahvaz

Date of Completion
2020

Services Delivered
Feasibility, Preliminary and Detailed Design of the Alignment and the Bridge/ Supervision of the Construction

Awards

Iranian Society of Steel Structures Award (2012)