Ahvaz Seventh Bridge over the Karoon Perennial River, Province of Khoozestan, Iran 

Spans: 30+75+2×140+75+30 of In-Situ Balanced-Cantilever Pre-stressed Concrete Single Cell Box Girder

Total Length of the Bridge 490m and Width of the Bridge 15m

Client
Municipality of Ahvaz

Date of Completion
1998

Services Delivered
Preliminary and Detailed Design of the Alignment and the Bridge/ Supervision of Construction

Awards

(Iranian Concrete Institute Award (2003