Fath- Yadegar Imam Intechange, Province of Tehran, Iran

Prestressed Concrete Voided Slab with the Maximum Span Length of 54m

Total Length of the Bridge 320m

5 Voided Reinforced Concrete Slab with the Maximum Span Length of 21m

Total Length of 118.7m

Client

Municipality of Tehran

Date of Completion

2014

Services Delivered

Preliminary and Detailed Design of the Intersection and the Bridge