Kaveh- Jaber- Abureyhan Interchange, Province of Isfahan, Iran

Reinforced Concrete Voided Slab and Prestressed Concrete Voided Slab with Span Arrangement of 3×25+26+60+26+3×25/ Total Length of the Bridge 262m

One Underpass with the Length of 130m and Two Spans of 15.3m with the total Length of 30.60m

Two Directional Bridge with two Spans with the Length of 15.30m and the Width of 9m/ Total Length of the Bridges 30.60m

Client

Municipality of Isfahan

Date of Completion

2009

Services Delivered

Preliminary and Detailed Design of the Bridge/ Supervision of Construction