Najafi Interchange, Province of Hamadan, Iran
Three-Level Interchange Consisting of:
One Main Bridge of Pre-stressed Concrete Voided Slab with Maximum Span of 44m and Total Length of 233m
One Directional Bridge of Pre-stressed Concrete Voided Slab with Maximum Span of 45m and Total Length of 595m
Client
Municipality of Hamadan
Date of Completion
2015
Services Delivered
Preliminary and Detailed Design of the Interchange and the Bridge/ Supervision of the Construction (EPC Mode)