Welcome to Hexa's Website > Projects > All Projects > The 8th Ahwaz Bridge

 

 

The 8Th bridge of Ahwaz


Project :Construction of a bridge over the karoon dam

Employer :Municipality of Ahwaz

Hexa's Responsibilities :Design and supervision along with Lap Co

Structural Type :Cable-stayed bridge consisting of pile-group fundationb system, A-frame pier & pylons and composite deck consisting of steel box grider beams and RC slab spanning 212m in the middle

Span:6*25+78+78+212+5*25 m

Date of Complettion :Being constructed

 

The river Karun crosses through the Khuzestan province in south west of the country telling one of Iran’s major cities – Ahwaz – apart. It has long been Hexa’s duty investigating and designing the best ways to crossing over the river. The 8th bridge completed in 2011 as second long spanned cable stayed bridge in the country has contributed to aesthetic aspects of the city and subsequently the 9th bridge is being constructed as longest spanned concrete box girder bridge in Iran.

 


 

All Projects

company contacts info

Head Office No. 13,8th Alley, Ashuri St.,West Zeynali St., North Sohrevardi Ave., Tehran, Iran Tel : (+98) 21 - 8850 6230 , 8874 2174 Fax : (+98) 21 - 8874 4900 Main Email : info@hexa.ir , gi@hexa.ir

latest project