Karoon III Bridges (Izeh,Iran)

Project :Two access bridges over the lake of Karoon dam III as a linking road for izeh
Employer :Iran Water & Power Resources Development Co.
Responsibilites of Rahavar-Hexa Join Venture :Design check of bridges and supervision on construction
Structural Type :Steel arch bridge with deck over the arch constructed by cantilever method
Main Span :252m for the longer bridge & 160m for the shorter one
Length of Bridge :336m for the longer bridge & 213m for the shorter one
Date of completion :2004